Copyright © 2019 Instream Energy Systems Corp.

+1 (604) 569-2769

info@instreamenergy.com

  • Black Twitter Icon
  • Black Facebook Icon
  • Black Instagram Icon
  • Black YouTube Icon
  • Black LinkedIn Icon
Please reload

Recent Posts

InTER Project Complete with the Launch of the Marinus Platform

October 15, 2019

1/2
Please reload

Featured Posts

Hydropower Generation Opportunities Increasing at Bureau of Reclamation Facilities

September 13, 2013

Instream has successfully completed phase one of testing on their 25kW capacity turbine designed by BAE Systems at the Roza Canal in Washington. Phase two planning is presently underway. Instream has been working closely with the Bureau of Reclamation during the installation and testing of their technology. The below link discusses the Bureau of Reclamations activities in hydropower generation including Instream’s project. 

 

Read the article.

Share on Facebook
Share on Twitter
Please reload

Please reload

Search By Tags
Please reload

Archive