Copyright © 2019 Instream Energy Systems Corp.

+1 (604) 569-2769

info@instreamenergy.com

  • Black Twitter Icon
  • Black Facebook Icon
  • Black Instagram Icon
  • Black YouTube Icon
  • Black LinkedIn Icon
PRESS RELEASES AND INSTREAM NEWS

March 13, 2014

Sandia National Laboratories is collaborating with U.S. Bureau of Reclamation and Instream Energy Systems, who has been deploying a vertical-axis turbine at the site, to characterize the effect of hydrokinetic turbine operation in the Roza Canal using field measurements and numerical modeling. 

Read the article.

February 10, 2014

The Renewables Portfolio Standard (RPS) states that, all sellers of electricity in California, including publicly owned utilities (POUs), investor-owned utilities (IOUs), electricity service providers (ESPs), and community choice aggregators (CCAs), are required to procure a portion of their electricity retail sales from eligible renewable resources to meet the following goals:

For more information regarding the RPS guidelines please refer to the California Public Utilities Commission website: http://www.cpuc.ca.gov/PUC/energy/Renewables/

September 13, 2013

Instream has successfully completed phase one of testing on their 25kW capacity turbine designed by BAE Systems at the Roza Canal in Washington. Phase two planning is presently underway. Instream has been working closely with the Bureau of Reclamation during the installation and testing of their technology. The below link discusses the Bureau of Reclamations activities in hydropower generation including Instream’s project. 

Read the article.

Please reload